Reliance-ECP - Project Showcase
Home - Project Showcase
Roads+
Jaipur-Reengus Toll Road
- 52km, 4/6-lane National Highway (NH11) connecting Reengus in the northern part of Rajasthan to the state capital, Jaipur
- Tolling for the road project commenced in July 2013
Gurgaon-Faridabad Toll Road
- Construction and tolling of 33.10km, 4-lane corridor between Gurgaon and Faridabad and improvement and reconstruction of 33.98km Ballabgarh-Sohna road
- 66km, 4-lane road commercially operational since June 2012
Hosur- Krishnagiri Toll Road
- 60km, 6-lane road between Hosur and Krishnagiri in Tamil Nadu on the National Highway (NH7)
- Work included one major bridge, ten minor bridges and three flyovers
Delhi-Agra Toll Road
- 180km, 6-lane road between Delhi and Agra on the National Highway
- Scope of work included eight minor bridges and 16 flyovers
Kandla-Mundra Toll Road
- 71km, 4/6-lane road between Kandla and Mundra ports in Gujarat on the National Highway (NH8A)
- The scope of work included six major bridges and 18 minor bridges
Pune-Satara Toll Road
- 140km, 6-lane road between Pune and Satara on the Nationa Highway (NH4)
- The scope of work included five major bridges, 53 minor bridges and 12 flyovers.
- This project is part of the Golden Quadrilateral which connects Mumbai and Bengaluru
New Projects
1.Nagpur - Mumbai
2.kashedi ghat
3. VSRP - (Vikkaravandi to Sethiyahopu)
4. JGRP (Jharkhand / Bihar Border (Chordaha) – Gorhar)
5. Nagpur-Mumbai Expressway package 7
Metro+
Project Highlights
- First metro project awarded on public-private-partnership (PPP)
- RInfra partnered MMRDA in Mumbai to successfully implement a world-class mass rapid transport system for the city of Mumbai
- Versova-Andheri-Ghatkopar corridor mass rapid transit system (MRTS) project was awarded by Mumbai Metropolitan Region Development Authority (MMRDA) through a global competitive bidding process to RInfra
- The project involved design, financing, construction, operation and maintenance of 12km elevated metro with 12 stations enroute
- 10 crore commuters in the first year of operation
- Connects western residential suburbs to the central industrial suburban areas
- A commuter saves 21,900 minute of travel time annually
New Projects
1.Mumbai Metro Line 4
Solar+
Dhursar I Rajasthan
100 MW
Solar thermal CSP
Project Details
- Capacity: 100MW solar thermal Concentrated Solar Power (CSP)
- Technology: Compact Linear Freshnel Reflector (CLFR)
- Solar fields: 35 Solar Steam Generator (SSG)
- Plant area: 340 hectares
- Power off-take: 220kV, 2 lines (connected to Dechu sub-station)
Dhursar I Rajasthan
40 MW
Solar thermal CSP
Project Details
- Capacity: 40MW solar PV
- Technology: Thin film
- Solar modules: 5,00,000
- Plant area: 140 hectares
- Power off-take: 220 kV, 2 lines(connected to Dechu sub-station)
Transmission+
Maharashtra
Project Details
- The transmission line projects comprise of six 400kV lines of 2100 circuit km: Solapur-Karad, Pune-Auranagabad, Parli-Solapur, Solapur-Kolhapur, Lonikhand-Kalwa in Maharashtra bordering Karnataka
- All six lines have been commissioned
Gujarat
Project Details
- The transmission line projects comprise of three 400kV lines of 1,000 circuit km which connect Limdi, Vadavi, Kansari and Karamsad in Gujarat and border Madhya Pradesh at Rajgarh
- Two of these lines have been commissioned and the third line is to be commissioned
Himachal Pradesh
Project Details
- The transmission line project comprises 400kV lines of around 480 circuit kilometers: Parbati-Koldam and Koldam-Ludhiana
- The Parbati-Koldam lines have already been commissioned. The Parbati end will be connected to Sainj for evacuation of the hydro plant that is soon to be commissioned
Mumbai
Project Details
- Mumbai transmission is operating with 8x220kV extra high voltage (EHV) substations having a total of 3,000MVA transformation capacity with around 540 circuit km of overhead and underground transmission feeders
- Transformation capacity has been augmented at three old AIS substations, while five new GIS stations have come in place during the year 2011 and 2012
Uttar Pradesh
Rural Electrification Project
Project Highlights
- The project involved establishing a power distribution network in the rural areas of Uttar Pradesh where an network did not exist earlier
- The project involved construction of 33/11kV substations, laying of 33kV transmission lines, 33/11kV augmentation substations, 11kV sub-transmission lines, distribution substations (10/16KVA), and power connections to below-the-poverty line (BPL) and rural consumers
- The project was simultaneously executed under the three discomms of UPPCL
Distribution+
Delhi
- 38 lakh customers, 24/7 reliablity
- Loss levels reduced from 55% to ~15%
- Rs 5,000 corers spent on network upgradation
- Outage reduced: 5 hrs/day to < 3 min
- Network reliability improved by ~30%
- Consultancy to Haryana Bijli Vitran Nigam and electricity boards of Nigeria and Ethiopia
Airports+
Connectivity
- State- of-the-art infrastructure and facilities to business jets and for flight training academies
- The airports act as feeders of nonscheduled aircraft to the metro airports
RADPL
Project Details
- RInfra with its subsidiary company, Reliance Airport Developers Private Ltd (RADPL), operates five brownfield airports in Maharashtra: at Nanded, Latur, Baramati, Yavatmal and Osmanabad
- The Maharashtra Industrial Development Corporation (MIDC) in 2009 awarded RADPL lease rights for 95 years to develop and operate them
New Projects
Smart City+
Project Highlights
- The IT implementation work for the Chhattisgarh State Power Distribution Company Ltd (20 towns) has been successfully completed
- The IT implementation work for the South Bihar State Power Distribution Company Ltd and North Bihar State Power Distribution Company Ltd (71 towns) is nearing completion
Project Details
- RInfra has executed 2 IT implementation projects in the power distribution utilities of Chhattisgarh and Bihar
- The IT work includes establishment of Data Centre, Disaster Recovery Centre and Customer Care
- The governing and supervision bodies are MoP and PFC
Township Project+
Project Details
- Club (with auditorium), rain water-harvesting
- School (up to primary)
- Fitness centre (fullfledged gym with swimming pool)
- Health centre, VIP guest house (15 rooms)
- Field hostel (42 rooms), shopping centre, etc
- Water and sewage treatment plants
Spread over 55 hectares, Rosa Power township is a lush, green, 100% environmentally-compliant township having 370 dwelling units for
accommodating the O&M staff. It is well-connected with National Highway 24 and State Highway 25 and comes complete with all amenities.
Thermal Power+
Sasan I Madhya Predesh
3960MW
Ultra mega power project
Project Details
- Capacity: 3960MW (6 x 660MW super critical units)
- Annual generation: ~ 33BU per year
- Overland conveyor coal transportation
- Power evacuation: 765/400kV level to PGCIL pooling station
Project Highlights
- Largest integrated coal-based power plant in the country
- Amongst the ten largest coal-based plants in the world
- Single flight overland conveyor of 14km from the capitive mine
- Triple flue chimney with largest base diameter (37m) for 3x660MW unit
- FRP cooling tower
- Water obtained through 22km of pipeline connecting Govind Vallabh Pant Sagar lake reservoir
- Electrical switchyard: 765kV/400kV
- Remote centralised control room for operation and control of power plant
- Deployment of the biggest mining equipment in an integrated coal-based power plant
- For the first time in the India, boiler light-up for steam blowing done with coal firing resulting in fuel savings
- Three units achieved full load from first synchronisation: < 7 days
- Five units commissioned and synchronised with the grid consecutively within 14 months
- All six units have been commissioned and the power station (6x660MW) is in operation since April 2015
Reliance EPC has also executed the following thermal power projects
BUTIBORI | Maharashtra | March 2016
- 2x300MW coal-based thermal power
RAGHUNATHPUR | West Bengal | March 2016
- 2x600MW coal-based thermal power
HISSAR Haryana | March 2011
- 2x600MW coal-based thermal power
PARICHHA Uttar Pradesh | April 2013
- 500MW coal-based thermal power
- 2x250MW (Balance of plant)
YAMUNANAGAR Haryana I June 2008
- 2x300MW coal-based thermal power
Samalkot I Andhra Pradesh
2400MW
Gas-based combined
cycle power project
Project Details
- Capacity: 2400MW (3x800MW nominal capacity)
- Power evacuation: At 400kV level through 2x400 kV DC Quad lines to PGCIL Vemagiri pooling station
- Water supply from Godavari river
- Fuel supply: Gas pipeline of 50km from Gadimoga landfall
Project Highlights
- Advanced class 9FA gas turbines
- Largest gas-based capacity by a private sector power producer
- Four gas turbines (9FA, 240 MW) erected at “Full speed-no load18 months: a new global standard
- Lowest acre per megawatt compared with similar plants in India
New Projects
Air Quality Control+
Project Details
- Flue Gas Desulphurization (FGD) System for 2X250 MW Dahanu TPS
- Technology: Sea Water based
- Flue Gas Flow: > 11,00,000 NM3/hr
- Inlet SO2 concentration: 1000-1100 mg/NM3
- SO2 removal efficiency: > 95%
- Auxiliary Power Consumption: < 1%
Project Highlights
- First FGD system commissioned in India
- Fastest execution time which was less than one year
- In successful operation since year 2007.
New Projects
Nuclear+
- Reliance Infrastructure has executed two projects for Nuclear Power Corporation.
- The projects executed were EPC of the main electrical system package for 2x220 MW at Kaiga, Karnataka and 2x220MW at RAPP, Kota, Rajasthan.
- Total project cost: Rs 200 crores
- The projects were completed in 2009
New Projects
1. Common services systems for 2x1000 MW KKNPP
Heavy Civil Infra+
New Projects